Scope of works included the warm shell fitout of 2 workspaces and an End of Trip in the basement. Tenancy A is a 455m2 fit-out for an existing tenant. Tenancy C is a 222m2 is a spec suite fitout for a future tenant with custom built booths, an activated alternative working touchdown bench, a kitchen and collaborative standup spaces.
City Holdings
VIC
2024
Urban Core